Forty-five feet of emission-free articulating reach. The outdoor electric boom.
Genie Z-45 FE 45-ft fully electric articulating boom. 25 ft horizontal reach, 500 lb capacity, 40 kWh lithium-ion, 4WD/4WS. Genie SkyGuard overhead protection standard.
✓ In Stock — Ships in 5-10 business days
We respond within 24 hours — pricing, availability & shipping included
Thanks! We'll get back to you within 24 hours with pricing, availability, and shipping details for the Genie Z-45 FE Electric Articulating Boom Lift.
| Drive | 4WD / 4WS, oscillating axle |
| Model | Z-45 FE |
| Power | 100% electric — 40 kWh lithium-ion |
| Boom Type | Articulating, 2-section + 6-ft jib |
| Manufacturer | Genie (Terex) |
| Platform Size | 30" × 60" (0.76 m × 1.52 m) |
| Certifications | ANSI/SAIA A92.5, CE EN 280, CSA B354.4 |
| Machine Weight | 15,100 lbs (6,849 kg) |
| Working Height | 51 ft (15.54 m) |
| Battery Runtime | 8+ hours (standard operation) |
| Platform Height | 45 ft (13.72 m) |
| Max Gradeability | 40% |
| Platform Capacity | 500 lbs (227 kg) |
| Horizontal Outreach | 25 ft (7.62 m) |
Multi-angle views of the Genie Z-45 FE Electric Articulating Boom Lift. Click any image to zoom.
Watch the Genie Z-45 FE Electric Articulating Boom Lift in action — full installation and operation demo.
Aerial work platforms (man lifts) use an electric-hydraulic or electric-mechanical scissor or mast system to raise an operator and their tools to height. All ground and platform controls are designed for one-person operation.
All functions — drive, steer, and lift — are available from the ground control panel at the base of the unit. Use ground controls for initial positioning and for emergency lowering. Ground controls override platform controls when the key switch is set to "ground" mode.
A control box mounted on the platform guard rail operates drive, steering, and lift from elevated position. The deadman switch (hold-to-run) on the lift/lower lever must be held continuously — releasing it stops all motion immediately.
Before raising above a defined height (typically 6 feet), the outriggers must be deployed and load indicators must confirm level ground contact. The lift will not raise above the outrigger threshold if any outrigger shows inadequate ground contact.
A manual hydraulic pump or gravity-controlled valve at the base of the unit lowers the platform in the event of power failure. The emergency lower valve is clearly labeled and accessible without tools. Familiarize all operators with its location before first use.
All platform motion controls require continuous hold-to-run activation. Releasing the control lever stops all motion immediately. The deadman system means a worker losing consciousness or balance halts the machine automatically.
An electronic inclinometer prevents lift operation beyond the rated slope. If the machine is on a slope exceeding the interlock threshold, the lift function is disabled until the machine is moved to level ground.
The lift cannot raise above a set height until all outriggers show positive ground contact. Even a single outrigger without firm contact blocks elevation above the interlock threshold — preventing tip-over on soft or uneven ground.
Full-perimeter guardrail system with mid-rail meets OSHA 1910.29 and ANSI/SAIA A92.20 requirements. A self-closing entry gate prevents the operator from exiting the platform at height. D-ring anchor points are rated for fall arrest attachment.
Z-45 FE vs. Z-45/25J (gas/LPG): identical platform capabilities, completely different powertrain. The FE's 40 kWh lithium-ion battery eliminates fuel costs and emissions entirely. On a busy construction site with 8 hours/day utilization, the FE can save $15–20/day in fuel vs. gas equivalents. For projects requiring extended outdoor use without 110V access, the gas version still makes sense. For anything near schools, hospitals, food facilities, or with LEED/green building requirements, the FE is the professional specification choice.
No reviews yet
Be the first to share your experience with this product.